• Recent
    • Unsolved
    • Tags
    • Popular
    • Users
    • Groups
    • Search
    • Register
    • Login

    Green FOG - Change amount of time to shutdown

    Scheduled Pinned Locked Moved Solved
    FOG Problems
    4
    9
    1.9k
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • G
      GFm
      last edited by

      Is it possible with Green FOG to change the amount of time it takes to shutdown… so the users have more of a warning?

      i.e. - green fog is set to 6pm for me. Can I have the alert pop up that it is going to shut down changed to like 20 minutes before it actually shuts everything down?

      Thanks!

      1 Reply Last reply Reply Quote 0
      • S
        Sebastian Roth Moderator
        last edited by

        @GFm Which version of the FOG client (and FOG itself) are you using?

        Web GUI issue? Please check apache error (debian/ubuntu: /var/log/apache2/error.log, centos/fedora/rhel: /var/log/httpd/error_log) and php-fpm log (/var/log/php*-fpm.log)

        Please support FOG if you like it: https://wiki.fogproject.org/wiki/index.php/Support_FOG

        G 1 Reply Last reply Reply Quote 0
        • G
          GFm @Sebastian Roth
          last edited by

          @Sebastian-Roth

          0.9.11 I think… it’s the latest or close to it

          ch3iC 1 Reply Last reply Reply Quote 0
          • ch3iC
            ch3i Moderator @GFm
            last edited by

            @GFm In the web UI : FOG Configuration > FOG Settings > FOG Service > FOG_GRACE_TIMEOUT

            G I 2 Replies Last reply Reply Quote 1
            • G
              GFm @ch3i
              last edited by

              @ch3i Awesome… thanks!! Just what I needed

              1 Reply Last reply Reply Quote 0
              • I
                ITSolutions Testers @ch3i
                last edited by

                @ch3i @GFm you might want to note that this will also change the grace period anytime FOG needs to restart the systems too. So If you send an image it could take 20 min to restart and start to image, this will most likely give 20 min before restarting if you change the host name and may also be the case if you join to AD. Not sure if that will effect you or not but wanted to be sure that you were aware of that.

                G 2 Replies Last reply Reply Quote 0
                • G
                  GFm @ITSolutions
                  last edited by

                  @ITSolutions Thanks… i’ll do some checking on that to verify. I will reply with what it does

                  1 Reply Last reply Reply Quote 0
                  • G
                    GFm @ITSolutions
                    last edited by

                    @ITSolutions I just imaged and it was fine… went through like normal with the restarts between joining the domain

                    I 1 Reply Last reply Reply Quote 0
                    • I
                      ITSolutions Testers @GFm
                      last edited by

                      @GFm Good to know, thanks for testing and reporting back.

                      1 Reply Last reply Reply Quote 0
                      • 1 / 1
                      • First post
                        Last post

                      149

                      Online

                      12.0k

                      Users

                      17.3k

                      Topics

                      155.2k

                      Posts
                      Copyright © 2012-2024 FOG Project